Project 06 · Helmond
Toilet renovation with new tiles
A completely renewed toilet: old tiles removed, walls and floor neatly levelled and fully retiled, with new sanitary ware.
A full renovation of a small toilet, from bare walls to a cleanly finished space — old tiles removed, substrate levelled and fully retiled, completed with new sanitary ware.
Work carried out
- Old tiles removedWalls and floor were completely stripped of the existing, dated tiling.
- Walls and floor levelledThe substrate was made flat to give a perfect base for the new tiling.
- New 300x600 mm tiles fittedWalls and floor were retiled, with 5 rows of tiles on the wall for a total tiled height of 1.50 m.
- New toilet and basin fittedSanitary ware fully replaced for a modern, fresh finish.
The toilet has gone from a dated space to a clean, modern whole with neat tiling and new sanitary ware.
In pictures
Photos from this project